![]() |
Adjusting slack automagically |
![]() |
The corroded steam pipe |
![]() |
The newly shorted steam pipe |
I joined in with the team at work on Foremarke Hall which is now parked up on the newly concreted section of road 8.
![]() |
Tim applied primer to the driving wheels |
![]() |
John & Steve creating the new steam heating pipe work |
![]() |
Steve welding a flange onto the steam heat pipe |
Speaking of firemen who might be tempted to lose surplus steam into the steam heating, I spent the day polishing up Foremarke Hall's coupling rods:
![]() |
One finished one on the right, the rest yet to be done |
![]() |
Four finished coupling rods |
As usual, several infrastructure jobs were on the go as well. Preparing road 9 for the laying of the next section of concrete floor was well under way:
![]() |
Mark, Tim & Steve excavating road 9 |
![]() |
Neil at work on road 9 |
![]() |
Trevor painting the stand of the water column |
![]() |
2807 Express |
![]() |
No such confusion with 4270 |
![]() |
Ian and his test cable |
![]() |
Just about out of coal |
![]() |
Chris, begrimed but happy |
And finally, on Tuesday, the GWSR fielded its youngest possible steam loco crew, Dan and Ben having a combined age of just 45, less than half of that of the loco they were crewing (2807).
![]() |
Dan(L) and Ben. |
Oldest combined age, 149 when Jeff Madge and I get together, a mite more than 45 what!!
ReplyDelete